This kitchen was upgraded from the late 1970's to today's top of the line appliances and materials. The slideshow documents the original kitchen, construction and completed project.
My wife and I had been planning to remodel our old out dated kitchen
for a number of years. We had obtained a number of quotes from very
reputable companies and at the last hour I was referred to BAB Home
Improvements. When we received the quote, I was surprised at the
difference between their quote and the others. Nevertheless, after
reviewing the quote with Mark to make sure I was not dreaming we
proceeded immediately. Our kitchen is absolutely stunning and when
friends and family saw it for the first time they were speechless. It
has been an absolute joy to deal with Mark, Drew and Pat. Their work
has been right on the mark and if any unexpected surprises came up
they were very welling to do what it took to make it right. I have
since had them back to remodel our master bath and again we have been
very pleased.
Doug McCorkle
Let's face it, accidents are going to happen. What you do after the accident is what matters most. I'll let our customer explain...
"Within 5-6 hours of my call to Mark at BAB HOME
IMPROVEMENTS, he and 2 co-workers were at our home to review the damage from an
auto collision with our house. Twenty-four hours later Mark, Drew and Pat began
work to repair our house, and in 3 days our house was back like new. Their
prices are reasonable. Their work is excellent. You can count on them to do
what they tell you. This is the finest construction company with which I have
ever dealt."
-- Douglas Byrd
This project was a complete bathroom and bedroom remodel. In the bathroom we installed a new whirlpool, removed a wall to allow for a new, larger vanity, built a large slate walk-in shower, installed a dual flush water efficient toilet, remodeled and installed an organization rack in the closet with new carpet, added recessed can lighting, new double sash window and finished the room with slate tile.
In the bedroom we painted the walls, smoothed the ceiling, added recessed lighting and wall sconces, replaced the french doors, added hardwood floors, and installed an entertainment system.
We replaced the older Masonite siding with the newer Hardiplank siding and painted the entire exterior of the house.
We started this kitchen remodel by installing recessed lighting after smoothing both ceilings. Next step was to install new cabinets and countertops, appliances, and tile. The final step was to refinish the hardwood floors throughout the house and paint all the walls.
These are the pictures of a recently completed attic that we converted into a guest room with storage.
This was a complete kitchen remodel including wall removal, new cabinets, appliances, granite countertops, flooring, light installation and painting.